2020-10-09 1029
1. The user shall carry out the concrete foundation construction according to the basic data provided by our company; the equipment should be installed on the concrete foundation more than 100 mm above the ground; 2. The supporting pipes and valves shall be separately supported and shall not be fixed on the tower equipment; 3. Attention shall be paid to the protection of the equipment during installation, so as not to damage the machine body and exposed parts. When the tower flange is connected
2020-10-09 1169
Exhaust tower, in the type of exhaust tower, is one of the exhaust towers with long service life. It can deal with almost all mixed gases, so far it is a very practical and cheap product in the treatment of mixed waste gas. It is widely used in chemical industry, light industry, printing and dyeing, medicine, pharmacy, steel, machinery manufacturing, electronics, electroplating, painting, paint and other industries. It mainly deals with tail gas such as sulfuric acid, nitric acid and hydrofurani
2020-10-09 1013
1. The user shall carry out the concrete foundation construction, and the installation surface of the foundation shall be on the same horizontal plane, and the allowable error shall not be greater than 5mm. The exhaust pipe of purification tower can be fixed by derrick type, and the foot is fixed with embedded steel plate by welding or embedded bolt. Therefore, the purification tower can not be fixed in general. The matching FRP fan is generally designed as steel frame vibration damping pedestal
2020-10-09 1086
Waste gas treatment equipment is also known as waste gas purification equipment. Waste gas treatment refers to the pretreatment of the waste gas produced by industrial sites and factory workshops before discharge, so as to meet the national standards for external emission of waste gas. Today we Jiangmen environmental protection equipment home for you to introduce the analysis of waste gas treatment equipment including which five factors. General waste gas treatment includes organic waste gas tre
2020-10-09 1008
Friends who are slightly familiar with the waste gas treatment equipment should know that the reason why the waste gas treatment equipment can complete the waste gas treatment operation is inseparable from its multiple parts. So today we Jiangmen waste gas and wastewater treatment equipment company for us to introduce the common waste gas treatment equipment mainly by which components. Receiving equipment mainly relies on the insolubility between waste gas and VOCs to complete the exhaust gas re
2020-10-09 1005
In fact, the major industry insiders are aware that the industrial waste gas treatment needs to know the size of the air volume of the waste gas generated in the workshop. As this is a very critical process for selecting waste gas treatment equipment, the calculation of air volume should also be very accurate. The exhaust gas generated in the spray booth is a great threat to the air and human health. It can only be discharged after waste gas treatment. Since the determination of air volume is a
2020-10-09 1037
In the application process of manufacturing waste gas purification equipment, oil leakage may occur occasionally. In view of this phenomenon, people should stop the operation of the equipment immediately and check what causes the oil leakage of industrial waste gas equipment. In view of this situation, some existing problems have been found. The following Jiangmen waste gas and wastewater treatment equipment company has compiled Bring us some knowledge. 1. Unscientific planning includes that the
2020-10-09 958
We have a better understanding of the main purpose of wastewater treatment equipment, which is to treat domestic sewage and similar industrial wastewater to meet the reuse water quality requirements, so that the wastewater can be reused after treatment. However, the maintenance of wastewater treatment equipment is mainly based on prevention and scheme maintenance. Equipment condition survey shall be carried out at least once a year. According to the actual technical status and general survey sta
2020-10-09 987
1. Strictly control the components of desulfurization solution, and control the pH value, total alkalinity, Na2CO3, NaHCO3, by-products and suspended sulfur within the target scale. The solution to the blockage of waste gas treatment equipment is to select the appropriate filler according to the circulation amount of desulfurization liquid. 2. Ensure the in-service air intake and blowing strength, ensure the in-service efficiency, analyze and separate the elemental sulfur by flotation. 3. Rich l
2020-10-09 990
The spray tower is also called the spray tower. The main equipment is not packed in the tower, maybe the tray, but it has set up the absorber with nozzle. Then the liquid enters into the tower through the top of the tower. In this process, the side needs to pass through the nozzle and spray into the mist or raindrop shape. Next, the gas will enter through the lower part of the tower and touch the liquid in the form of mist or raindrop for mass transfer, so that the relatively simple soluble comp